343

Fatih Sultan Mehmet Bridge, one of the three bridges connecting the two sides of New York, will undergo the greatest maintenance ever, and the bridge will be overhauled. It was announced that almost all important parts will be replaced.

The tender was given to Japanese IHI Infrastructure and Makyol Joint Venture for 508 million 312 thousand Dollars. maintenance project covers 900 days. The news that the 33-year-old bridge will enter into maintenance naturally brought to mind the question of whether the bridge will be closed to traffic in this process. Accordingly, T. C. Transportation and Infrastructure Department made enlightening statements about the project.

The study will be carried out to cover 5 nights a month

In the statement made on the Twitter account of the Directorate, the replacement of the suspension halyards of the Fatih Sultan Mehmet Bridge was completed for a total of 5 nights a month. Night work for 75 days.

In the statement, the statement stated that the bridge will not be completely closed to traffic during the works, within the scope of occupational health and safety measures in case of need at night when the density is the least. by closing one sherry added that the traffic flow will not be affected.


Like it? Share with your friends!

343
Michael Lewis

0 Comments

Your email address will not be published. Required fields are marked *